Implementation & migration center

Getting live is a method,
not a leap of faith.

Everything about how a Cortrova deployment actually runs: the five-phase parallel methodology, what data migration covers, how the cutover is validated, how the AI is calibrated to your floor, and how the same playbook ships to the cloud, on-premises, or fully air-gapped. Typical target: 4-8 weeks to go-live, with implementation included in the flat rate.

Scope your deployment See the five phases
4-8 weeks
Typical go-live target
Parallel
Deployment alongside current systems
33
Integrations in the inventory
Cloud · On-prem · Air-gapped
Deployment options

Data migration

Your history moves with you.

Migration is scoped in discovery, executed in its own phase, and validated before anything cuts over. The working checklist:

Master data

Items, BOMs, routings, work centers, customers, suppliers, and assets are extracted, cleaned, and mapped to the unified data model.

Open transactions

Open sales orders, work orders, POs, and inventory balances load last, so go-live starts from a position that matches reality.

Compliance history

Quality records, CAPAs, training records, and controlled documents migrate to the depth your audit and traceability obligations require.

Validation

Row counts, financial tie-outs, and user spot checks are signed off by your data owners before the parallel run begins.

Integration inventory

Every connection is named before it is built.

Discovery produces an integration inventory: every system that stays, every file feed, every machine or label printer that talks to the platform. Each connection gets an owner, a direction, and a test case, so cutover never discovers a forgotten interface.

CAD, PLM, and estimating systems that feed engineering data

Accounting or corporate ERP staying upstream of the floor

Machine monitoring, scales, and label or barcode hardware

Customer and supplier EDI or portal feeds

Training & AI calibration

Everyone trained, agents tuned to your floor.

Unlimited users means training is not rationed to a license count. Role-specific sessions run during the training phase, while the embedded agents are calibrated against your migrated data.

Role-based training

Operators, supervisors, quality, maintenance, planning, and finance each train on their own workflows - everyone gets a seat.

AI calibration

Scheduling constraints, SPC limits, maintenance thresholds, and inventory policies are tuned to your operation, inside the standard governance pipeline.

Validated cutover

A parallel run against agreed acceptance criteria decides go-live - a sign-off, not a hope.

Deployment architecture

Same method: cloud, on-premises, or air-gapped.

The deployment model changes where the platform runs, not how the implementation is executed. Regulated and export-controlled programs stage the entire toolchain, embedded AI models included, inside their own boundary.

Cloud

Fastest path for operations without data-boundary constraints; managed updates and scaling.

On-premises

The platform and its AI run on your infrastructure, inside your network and access controls.

Air-gapped

No external network calls at all - migration tooling, models, and updates staged inside the boundary for ITAR-controlled and classified-adjacent environments.

Legacy replacement

Replacing a legacy ERP, spreadsheets, or both.

Most deployments replace a patchwork rather than a single system: an aging ERP plus the spreadsheets and point tools that grew around it. The playbook is the same - inventory what each tool actually does, map every job to its module, migrate the data once, and retire the patchwork at cutover instead of running it in the shadows.

The five phases

Adopting Cortrova implementation.

01

Discovery & planning

Map the operation, name the data owners, build the integration inventory, and lock scope and acceptance criteria.

02

Data migration

Extract, clean, map, load, and validate - master data first, open transactions last.

03

Configuration & AI calibration

Workflows, permissions, and compliance settings configured; agents calibrated to your data.

04

Training

Role-specific training across the whole floor, since users are unlimited.

05

Validated go-live

Parallel run against acceptance criteria, then a signed-off cutover with all 205+ features live.

FAQ

Questions, answered.

How long does a Cortrova implementation take?

The typical target is 4-8 weeks from kickoff to validated go-live. The window assumes a mid-market operation, engaged data owners on your side, and the standard five-phase parallel deployment. Complex integration inventories or multi-site rollouts are scoped explicitly during discovery, so the timeline you sign is one that reflects your operation.

What happens to our data from the old system?

Data migration is a scoped phase, not an afterthought. Master data - items, BOMs, routings, customers, suppliers, assets, and open orders - is extracted, cleaned, mapped to the Cortrova data model, and validated with row counts and spot checks you sign off on. Historical transactions are migrated to the depth your compliance and costing requirements need.

Do we run both systems in parallel before cutover?

Yes. Cortrova deploys in parallel with your existing systems, and cutover happens only after a validated parallel run: the same orders, inspections, and transactions flow through both, and go-live is signed off against agreed acceptance criteria rather than a calendar date.

What does AI calibration involve?

The embedded agents ship with defaults, then get calibrated to your operation during configuration: scheduling constraints, quality characteristics and SPC limits, maintenance thresholds from your asset list, and inventory policies. Calibration uses your migrated data, and every agent runs inside the same governance pipeline described on our security page.

Can implementation run fully on-premises or air-gapped?

Yes. The same five-phase methodology applies to cloud, on-premises, and air-gapped deployments. For air-gapped installs, migration tooling, model hosting, and updates are staged inside your boundary, so export-controlled technical data never leaves your facility.

Is implementation an extra line item?

No. Implementation is included in the flat annual rate - discovery, migration, configuration, AI calibration, training, and the validated cutover - and all 205+ features are available from day one rather than unlocked over time.

Scope it

Tell us your systems. We'll map the path.

Share what you run today, your headcount, and your compliance constraints - we'll scope the phases, the integration inventory, and the timeline to your operation.

Scope your deployment Explore the platform